Technology status
Introducing All Nations Co., Ltd., opening the future.
No | Project Name | Period |
---|---|---|
239 | Daewoo E&C Kaduna Refinery quick fix PJT/ Algeria | 2023.09.01 ~2024.08.31 |
238 | Korea District Heating Corporation 2023 Gwanggyo heat transfer Tube NDE work/ Korea | 2023.08.04 ~2024.08.07 |
237 | Korea District Heating Corporation 2023 Suwon heat transfer Tube NDE work/ Korea | 2023.08.08 ~2024.08.07 |
236 | KPS Boiler Tube NDE work/ Korea | 2023.07.27 ~2023.09.25 |
235 | Samsung Engineering NRD-K Green dong –B / Korea | 2023.01.02 ~2025.09.30 |
234 | KEPCO SPC NDT for Unit 1 & 2 HP & ILP Turbine for A Class Overhaul / Philippines | 2023.03.25 ~ 2023.10.06 |
233 | Hyundae E&C The Firstiate I’ Park NDE work/ Korea | 2023.04.20 ~2023.11.02 |
232 | DECN Nigeria NLNG T7 NDE Work / Nigeria | 2023.08.18 ~ 2026..08.15 |
231 | KHNP Goesan Hydroelectric Power Unit 2 A_OH NDE work./ Korea | 2023.03.02 ~2023.03.17 |
230 | Samsung Engineering NRD-K UT dong Quality Test/ Korea | 2023.02.07 ~2024.11.15 |
229 | GS E&C Pyeongtaeak Jije station Xi piping/ Korea | 2023.01.05 ~2023.06.30 |
228 | SEOUL Dongbu Expressway Transmission and drainage pipe NDE work/ Korea | 2022.10.14 ~2023.12.30 |
227 | Samsung Engineering P4 PJT/ Korea | 2022.10.07 ~2023.05.31 |
226 | GS E&C Eunpyeong XI the star / Korea | 2022.08.20 ~2026.05.31 |
225 | GS E&C Donghae XI / Korea | 2022.08.05 ~2023.02.28 |
224 | Samsung C&T Mostaghanem CCPP PJT/ Algeria | 2022.06.07 ~2025.07.12 |
223 | GS E&C DMC XI / Korea | 2022.06.01 ~2022.11.30 |
222 | Hyosung chamical E4 PJT NDE work/ Korea | 2022.04.18 ~2022.08.30 |
221 | Hyundae E&C Jeju Hanrim Marine wind power Plant EPC/ Korea | 2022.05.01 ~2024.10.31 |
220 | GS E&C Deajun Soongieri seam House for reconstruction and maintenance PJT/ Korea | 2022.03.11 ~2024.11.09 |
219 | GS E&C Gaepo Residence Xi(Seoul) District heating, Gas Piping NDE work/ Korea | 2021.11.03~2023.02.28. |
218 | Samyoung Plant Asan Life support Treatment Plant incineration Waste heat alert steam supply construction/ Korea | 2021.11.01 ~2021.12.31 |
217 | GS E&C Ilsan XI 3rd District heating Piping NDE work/Korea | 2021.10.04~2022.02.28 |
216 | GS E&C Daegu station Xi NDE work /Korea | 2021.10.11~2023.03.31 |
215 | BITUS AEON MAll3 NDE work/ Cambodia | 2021.08.16~2022.01.05 |
214 | GS E&C Gyeryongzai (Chungnam)-NDE work/ Korea | 2021.05~2021.12 |
213 | KPS Hwasung OH GT NDE work/ Korea | 2021.04.01 ~2021.07.13 |
212 | H Plus Echo Installation of seabesteel Steam Piping NDE work /Korea | 2021.03.29~2021.06.30 |
211 | KEPCO SPC Constract for NDE for ILP Steam Turbine Unit 1&2/ Philippines | 2021.05.01 ~2020.07.04 |
210 | Samsung Engineering PAUT NDE work _A/ Korea | 2020.10.21 ~2020.11.30 |
209 | GS E&C Gwacjepm Xi (Gyeonggi) Piping NDE Work/ Korea | 2020.07.06 ~2021.11.30 |
208 | GS E&C LG Science Park DP2 Phase 2 New construction NDE work/ Korea | 2020.05.26 ~ 2024.10.03 |
207 | Hyundae E&C Hankook Tire MAIN P_G NDE work (Machine Piping)/ Korea | 2020.04.17~2021.06.31 |
206 | Samsung Engineering Green dong Finishing of S3-V line lower east side / Korea | 2020.04.01 ~ 2021.06.30 |
205 | GS E&C Steel welding in Brighton (Seoul) NDE work/ Korea | 2020.03.27 ~2023.04.30 |
204 | GS E&C Grand Intercontinental Parnas Hotel Remodeling Steel NDE work/ Korea | 2020.02.29 ~2020.10.31 |
203 | Samsung C&T Naama PJT 3rd Contract Amendment /Argeria | 2020.02.12~ 2020.07.04 |
202 | Dawoo ENC Gbaran Ph3 NDE work for Piping PJT/ Nigeria | 2020.01.17 ~2021.05.31 |
201 | Kpgas Pmsam Piping NDE work /Korea | 2020.01.07 ~ 2020.06.30 |
200 | Samsung Engineering Xian X2 Phase2 PJT Inspection/ China | 2020.03.01 ~ 2020.10.30 |
199 | Seoul NDE Steel Pipe work / Korea | 2020.01.01 ~2020.12.31 |
198 | Pocheon Combined Thermal power plant #2 Block NDE work/ Korea | 2019.10.07 ~2019.10.22 |
197 | KHNP Hanul Nuclear power plant ECT work/ Korea | 2019.09.02 ~2019.10.25 |
196 | Pyunghwa E&C Heat pipeline construction/ Korea – (Unit price constract) | 2019.11.20 ~ |
195 | IWI ADNOC CFP PJT / UAE –(Unit price contract) | 2019.05.27 ~ |
194 | GS E&C Dasan XI IB place Piping NDE work/ Korea | 2019.08.01 ~2020.12.31 |
193 | Samsung Engineering Network Chamber room NDE work/ Korea | 2019.02.15 ~2019.05.31 |
192 | GS E&C Dasan Xi Ivy Place NDE work / Korea | 2019-08-01~2020-12-31 |
191 | Kogas Onsan Piping NDE work / Korea | 2020-01-07~2020-06-30 |
190 | S-tank Karbala Refinery PJT NDE work / Iraq | 2018-03-01~2020-03-01 |
189 | Samsung Engineering E-PJT 3rd Party Inspection / Korea | 2018-04-01~2019-12-31 |
188 | Optimal Energy Service Hanul Nuclear Plant 2nd NDE work / Korea | 2019-09-02~2019-10-25 |
187 | Samsung C&T Naama PJT NDE work / Algeria | 2016-09-04~2019-09-04 |
186 | KPS Boryeong CCPP NDE work / Korea | 2018-04-20~2018-12-31 |
185 | S-OIL Residue Upgrading Complex PJT NDE work / Korea | 2016-08-01~2018-03-31 |
184 | Unit Price Contract for ACC MT Work of Setif Ain Arnat CCPP Project / Algeria | 2017-03-01~2017-08-31 |
183 | Ain Arnat 1200MW CCPP PJT MT,PT Work / Algeria | 2017-06-07~2017-08-31 |
182 | AEON Mall Phnom Penh Sen Sok City PJT NDE work / Cambodia | 2017-05-01~2017-08-31 |
181 | Chuncheon Hydro Power Plant #2 Planed Preventive Maintenance NDE work / Korea | 2017-04-24~2017-05-22 |
180 | Steel pipe NDE work / Korea | 2017-03-17~2018-03-31 |
179 | Refractory replacement work for incinerator of #2 / Korea | 2017-03-03~2017-06-10 |
178 | Ras Laffan C CCPP PJT Overhauling NDE & PWHT work / Qatar | 2017-02-27~2021-07-31 |
177 | Badra CPF PJT Ph.2 NDE work / Iraq | 2014-08-14~2017-10-31 |
176 | Chungsong Yangsoo #2 NDE work / Korea | 2017-01-18~2017-02-01 |
175 | S3 Wastewater Treatment Facility (Ph-2) Quality Technical Services / Korea | 2015-05-15~2017-09-15 |
174 | 2016 Gwangju,Jeollanam-do NDE work / Korea | 2016-02-03~2016-12-31 |
173 | Naama CCPP PJT Tank NDE / Algeria | 2016-11-02~2018-01-31 |
172 | Setif Ain Arnat CCPP PJT Piping NDE & PWHT work / Algeria | 2013-08-19~2017-08-31 |
171 | Incheon Paradise City Ph.1 NDE work / Korea | 2016-10-18~2017-12-31 |
170 | Hadong #6 Low-pressure Turbine Rotor 5th and 6th UT work / Korea | 2016-09-21~2016-10-05 |
169 | Banwol Power Plant Steam supply line ELBOW welding NDE work / Korea | 2016-09-07~2016-09-23 |
168 | Ulsan S-OIL RUC PJT Area4 PKG3 NDE work / Korea | 2016-08-01~2018-03-31 |
167 | KPS private contract Boryeong Power Plant Trial Run ECT work / Korea | 2016-07-12~2016-07-12 |
166 | Samsung P-Project Piping NDE Work / Korea | 2016-06-01~2016-12-31 |
165 | Naama CCPP PJT Piping NDE / Algeria | 2016-06-01~2018-07-30 |
164 | S3 Wastewater Treatment Facility (Ph-2) Quality Technical Services / Korea | 2015-05-15~2016-06-30 |
163 | P.6055 MSP PJT OFF Shore NDE work /Angola | 2016-03-26~2016-12-31 |
162 | 2016 NDT Unit price contract of Boryeong Power Plant Overhauling / Korea | 2016-03-29~2016-12-31 |
161 | Pocheon CCPP #1Block GT & ST NDE Work / Korea | 2016-04-19~2016-05-05 |
160 | 2016 KOGAS Tongyung NDE work / Korea | 2016-03-07~2016-12-15 |
159 | Steel pile NDE work / Korea | 2016-03-04~2017-03-31 |
158 | KPS private contract MT work / Korea | 2016-03-04~2016-03-04 |
157 | RDPP(Ras Djinet CCPP) PJT Piping NDE work / Algeria | 2015-03-30~2017-12-31 |
156 | Karbala Refinery PJT Tank PWHT work / Iraq | 2016-03-20~2017-03-21 |
155 | Korea Gas Corporation 2016 NDE Service / Korea | 2016-02-03~2016-12-31 |
154 | Daechung relocation steel pipe NDE work / Korea | 2016-01-07~2017-01-05 |
153 | DS-1 PROJECT Daegu CRT TANK NDE work / Korea | 2016-01-04~2016-06-31 |
152 | Ciprel 4 Volet B PJT trial run work / Cote d'Ivoire | 2016-01-01~2016-03-31 |
151 | Indorama Fertilizer PJT OSI work / Nigeria | 2015-11-10~2016-03-10 |
150 | Setif Ain Arnat CCPP PJT HRSG NDE & PWHT work / Algeria | 2014-09-01~2016-10-31 |
149 | S3-B De-Ionized Water Facility Construction / Korea | 2015-06-15~2015-12-31 |
148 | Chungsong Yangsoo #1 NDE work / Korea | 2015-11-01~2015-11-15 |
147 | Sinpeongtaek CCPP&Misa&Segyo collective energy supply lines Piping NDE work / Korea | 2014-03-19~2016-03-31 |
146 | Pocheon CCPP #3,4 PT work /Korea | 2015-9-24~2015-10-18 |
145 | Setif Ain Arnat CCPP PJT Piping NDE & PWHT work /Algeria | 2015-11-01~2016-10-31 |
144 | Nigeria Onne Wet Fluorescent (Black Lighting Inspection) | 2015-09-11~2015-12-31 |
143 | Iraq Karbala Refinery PJT / Piping NDE work | 2015-07-22~2018-02-09 |
142 | Korea Unit Price contract of the Seoul Central offices NDT services | 2015-08-06~2016-08-06 |
141 | Korea Unit Price Contract of Bundang Branch NDT services | 2015-07-29~2016-08-05 |
140 | Korea S3-B De-Ionized Water Facility Construction | 2015-06-15~2015-10-15 |
139 | Korea Jinan Water supply system adjust business of installation work Korea-NDE | 2015-06-08~2016-12-28 |
138 | CAMBODIA BITUS TK ROYAL ONE SITE NDE work | 2015-05-08~2015-07-28 |
137 | Korea Pocheon CCPP #2GT PT work | 2015-05-23~2015-06-12 |
136 | Korea Hanil Tank Terminal U/G & A/G Piping and SUS 316L Tank NDE | 2015-06-30~2015-10-31 |
135 | Korea S3 Wastewater Treatment Facility (Ph-2) Quality Technical Services | 2015-05-15~2016-06-30 |
134 | Angola P.6055 MSP PJT(OFF Shore) | 2015-05-01~2016-01-31 |
133 | Korea #1 Turbin and Boiler NDT PJT – Korea Kwangju Jueonnam | 2015-04-29~2015-12-31 |
132 | Cote d'Ivoire CIPREL 4 PJT / PMI Test | 2015-04-09~2015-07-09 |
131 | Algeria Ras Djinet CCPP PJT / NDE work | 2015-03-30~2016-02-24 |
130 | Korea Unit price contract of Boryeong Power Plant NDT | 2015-01-27~2015-12-31 |
129 | Korea STC NCC Recovery Section Optimization PJT | 2014-11-28~2015-07-31 |
128 | Korea STC SM#1 Modernization PJT | 2014-11-28~2015-07-31 |
127 | Samsung C&T , Prai CCGT Power Plant PJT, Malaysia- Tank Construction | 2014.11.01. ~ Present |
126 | Daewoo E&C, IEFCL PJT, Nigeria – Refractory | 2014.11.01. ~ Present |
125 | Daewoo E&C, IEFCL PJT, Nigeria – Tank Cleaning & Revamping | 2014.07.01. ~ Present |
124 | Daewoo E&C, IEFCL PJT, Nigeria – PAUT | 2014.06.01. ~ Present |
123 | Samsung Engineering, BADRA CPF 2nd Phase Project, Iraq | 2014.04.01. ~ Present |
122 | Daewoo E&C, IEFCL PJT, Nigeria – PWHT | 2014.04.01. ~ Present |
121 | Kostech, Bar Mill Plant Eraction Engineering | 2014.04.01. ~ 2014.12.30. |
120 | KOMIPO, Boryeong #2 Power Plant, Korea | 2014.03.01. ~ 2014.12.30. |
119 | KTI E&C, CIPREL IV Extension Project , Republic of Cote d'Ivoire | 2014.02.01. ~ Present |
118 | Sysco, GS E&C Linde RFCC Refratory Lining & Dry Out(780 Ton) | 2014.01.01. ~ 2014.08.30. |
117 | KTI E&C, Setif Ain Arnat CCPP Project, Algeria | 2013.10.01. ~ Present |
116 | Masan agricultural products wholesale market facilities PEB Construction – Korea | 2013.10.01. ~ 2014.03.30. |
115 | AEON Mall Construction , Bitus P.L.C.- Cambodia Pnompenh | 2013.09.01. ~ 2014.01.30. |
114 | Daewoo E&C, Sur IPP Project in Oman TOFD & M-UT Work | 2013.07.01. ~ 2014.01.30. |
113 | AML, Ferroalloy Plant - Malaysia | 2012.08.01. ~ 2012.12.30. |
112 | Gamchun Textile Factory PEB Steel Construction - Korea | 2012.06.01. ~ 2012.12.30. |
111 | Tohokusteel, EAF, Ladle, Tundish, Reheating 1 Set Dismantling Bar Mill work – Japan | 2012.05.01. ~ 2013.03.30. |
110 | Keangnam Enterprises Co., Ltd., Plant Factory Fabrication – Madagascar | 2011.11.01. ~ 2012.07.30. |
109 | Korea, OCI Company Ltd. , Installation and dismantling scaffolding work of Gwangyang plant liquid pitch T-250D Tank top frame | 2011.09.01. ~ 2011.12.30. |
108 | Korea, NHChem, Improvement work of Phosphoric acid storage tank PUMP STATION Environment | 2011.09.01. ~ 2012.12.30. |
107 | Hope School construction - Cambodia Phnom Phen | 2011.09.01. ~ 2012.08.30. |
106 | Korea, OCI Company Ltd. , Maintenance work of Gwangyang plant BTX T-862 COLO TANK | 2011.08.01. ~ 2011.12.30. |
105 | Korea, OCI Company Ltd. , Production & Replacement work of Gwangyang plant T-755 Toluene Tank | 2011.08.01. ~ 2011.12.30. |
104 | Allnations Education College construction - Cambodia Phnom Phen | 2011.07.01. ~ 2011.12.30. |
103 | Korea, OCI Company Ltd. , Fabrication and Installation work of TDI production plant in Gunsan and T139D TANK | 2011.06.01. ~ 2012.05.30. |
102 | Korea, OCI Company Ltd. , Maintenance work of Gwangyang plant BTX T-861 COLO TANK | 2011.06.01. ~ 2011.08.30. |
101 | Korea, BDH, Fabrication & Installation work of Fly/Bottom Ash Silo, Air Lock, Surge Hopper | 2011.04.01. ~ 2011.12.30. |
100 | Korea, Daelim, PP TR1,2 TA WORK BLENDER SILO VENT AIR LINE SEP | 2011.03.01. ~ 2011.12.30. |
99 | Korea, EWP, Structure safety inspection work of Diesel storage tank #B | 2011.01.01. ~ 2011.03.30. |
98 | Korea, Hanyulns, insulation work of KT-3 Coal Tar TANK ordination Drain pipe | 2011.01.01. ~ 2011.05.30. |
97 | Yeoju Warehouse PEB Construction - Korea | 2010.12.01. ~ 2011.03.30. |
96 | Korea, EWP, Maintenance work of B36 structure stored oil tank and safety check inspection work | 2010.10.01. ~ 2011.01.30. |
95 | Korea, OCI Company Ltd. , Fabrication and Installation work of Gunsan TDI T139C TDA Storage Tank | 2010.08.01. ~ 2011.07.30. |
94 | Korea, Gwangyang tank terminal , Fabrication & installation work of Gwangyang tank terminal storage tank and ancillary equipment | 2010.07.01. ~ 2011.06.30. |
93 | Korea, OCI Company Ltd. , Fabrication and Installation work of Gunsan TDI T139C TDA Storage Tank | 2010.05.01. ~ 2011.04.30. |
92 | Korea, OCI Company Ltd. , TAR Plant T-726 Tank Bottom Plate Patching work | 2010.03.01. ~ 2010.05.30. |
91 | Korea, Baekdoo Ind., Fabrication installation work of Limestone Storage Silo | 2010.03.01. ~ 2011.02.29. |
90 | Ptt AC / AN and MMA AOG PROJECT Refractory Lining – Taiwan | 2010.01.01. ~ 2010.06.30. |
89 | Replacement work of Gwangyang Plant T-724 Naph 'Tank Bottom Plate | 2009.10.01. ~ 20.12.30. |
88 | Korea, Huechems, Installation work of 70% nitric acid storage tank | 2009.08.01. ~ 2010.07.30. |
87 | Korea, Nec-solon, Installation work of DEG TANK & SYSTEM | 2009.07.01. ~ 2010.06.30. |
86 | Korea, EWP, Structure safety inspection work of Diesel storage tank #A | 2009.06.01. ~ 2009.07.30. |
85 | Korea, OCI Company Ltd. , Repair work of Gwangyang TAR Plant T-722,729 Tanks | 2009.05.01. ~ 2009.12.30. |
84 | Arian Steel, Reheating Furnace Construction Ladle, Tundish – Iran | 2009.05.01. ~ 2009.10.30. |
83 | Korea, A-sung PLT., improve the system of EPOXY TANK SYSTEM operating methods and shipment | 2009.04.01. ~ 2009.05.30. |
82 | Korea, OCI Company Ltd. , Internal inspection of C/B T-501A # 2 TANK | 2009.04.01. ~ 2009.05.30 |
81 | Korea, OCI Company Ltd. , Repair work of WWT TK-120 Oil Sedation Tank Patching | 2009.03.01. ~ 2009.09.30. |
80 | Daewoo, Shipyard site, Qatar – Electrical services | 2009.02.01. ~ 2009.09.30. |
79 | Korea, OCI Company Ltd. , Maintenance work of Gwangyang plant TANK T-664 FCC storage | 2008.12.01. ~ 2009.05.30. |
78 | Korea, Hanwha E&C, CLARIFIER TANK(CA4-S-012) | 2008.10.01. ~ 2009.08.30. |
77 | Korea, Huechems, Installation work of Toluene storage tank VOC treatment facility | 2008.09.01. ~ 2009.08.30. |
76 | Korea, OCI Company Ltd. , Fabrication work of TAR T-641 Tank Top Plate | 2008.08.01. ~ 2008.11.30. |
75 | Korea, OCI Company Ltd. , Replacement work of Gwangyang plant T-641 Tank Roof Plate | 2008.08.01. ~ 2010.12.30. |
74 | Korea, OCI Company Ltd. , Replacement work of Gwangyang plant Pitch T-223 Tank Bottom Plate | 2008.08.01. ~ 2009.01.30. |
73 | Korea, OCI Company Ltd. , Second phase expansion work of Gwangyang plant BTX NON-ARO TANK and 2 more | 2008.07.01. ~ 2008.12.30. |
72 | Korea, Huechems, Welding repair work of Concentrated nitric acid storage tank (TK-104/204) ROOF | 2008.05.01. ~ 2009.01.30. |
71 | Korea, OCI Company Ltd. , T-224 Pitch Tank Bottom Plate Replacement | 2008.05.01. ~ 2008.10.30. |
70 | Korea, Huechems, Replacement of New plumbing & the pump and LINING construction of tank FRP | 2008.04.01. ~ 2009.12.30. |
69 | Korea, OCI Company Ltd. , TAR T-663 Tank Transfer Pump installation work | 2008.04.01. ~ 2009.12.31. |
68 | Korea, Kosep, # 6 FO TANK Periodic Inspection | 2008.02.01. ~ 2008.10.30. |
67 | Daewoo E&C, Hyundai green thermal steel power plant boiler 1-4 Island construction | 2008.01.01. ~ 2009.12.30. |
66 | Korea, EWP, Clean inside R5 TANK | 2007.10.01. ~ 2008.02.29. |
65 | Korea, Kosep, Plant No. 2 Milk of Sulfur Tank and Flushing tanks inspection work | 2007.10.01. ~ 2008.07.30. |
64 | Korea, E-Tec E&C KFCT-P/J FCC & COLO Storage Tank production Installation work | 2007.10.01. ~ 2009.02.29. |
63 | Korea, OCI Company Ltd. BTX T-813 TANK maintenance work | 2007.09.01. ~ 2008.12.30. |
62 | Korea, OCI Company Ltd. Gwangyang plant refurbishment T-632,725 | 2007.10.01 ~ 2008.12.30 |
61 | Korea, OCI Company Ltd. BTX T-667 TANK maintenance work | 2007.07.25 ~ 2008.03.30 |
60 | Korea, OCI Company Ltd. BTX T-863 TANK maintenance work | 2007.05.01 ~ 2007.12.30 |
59 | Daewoo E&C, Plant Factory Fabrication - Nigeria | 2007.05.01 ~ 2008.10.30 |
58 | Korea, Kosep, Plant No.1 Cleaning construction before Milk of Sulfur tank leak check | 2007.04.01 ~ 2008.03.30 |
57 | Korea, OCI Company Ltd. TAR TANK FUME subong equipment and installation work | 2007.02.01 ~ 2008.06.30 |
56 | Essar Steel, Hyundai Steel corex 2 Sets Dismantling - India | 2007.02.01 ~ 2008.01.30 |
55 | Korea, OCI Company Ltd. TAR TANK FARM FUME LINE plumbing | 2007.02.01 ~ 2008.07.30 |
54 | Korea, OCI Company Ltd. BTX Tank Farm Stair Handrail fabrication, installation work | 2007.02.01 ~ 2008.06.30 |
53 | Daewoo E&C, Plant Fabrication Shop Plant - Nigeria | 2006.05.01 ~ 2007.04.30 |
52 | LNG TANK Pipe construction – Yemen | 2006.07.01 ~ 2007.06.30 |
51 | Suwon District Transmission Pipe | 2006.3~Present |
50 | Incheon Combined Heat and Power Plant | 2004.2~Present |
49 | Incheon LNG | 2005.2~2005.4 |
48 | Sakhalin Energy Phase II LNG Project | 2005.11~Present |
47 | Sakhalin Energy Phase II LNG Project | 2006.4~Present |
46 | Sakhalin Energy Phase II LNG Project | 2004.12~Present |
45 | Sakhalin Energy Phase II LNG Project | 2004.12~Present |
44 | Shinhan Machinery | 2004.5~Present |
43 | DaeKyung Plant in korea | 2004.2~Present |
42 | NAFOORA PJ | 2002.12~Present |
41 | GunMin IND. | 2003.8~Present |
40 | N-LNG PHASE3GAS SUPPLY PJ | 2002.11~Present |
39 | KUPFEC PJ | 2002.10~Present |
38 | Libya Bengagi PJ | 2002.9~Present |
37 | Dae Kyung MachineryENG`G | 2002.9~2003.1 |
36 | KWALE PHASE 1 | 2002.9~Present |
35 | WAFA PJ | 2002.8~Present |
34 | Jeju incinerator | 2002.6~Present |
33 | Ulsan Steam Power Plant | 2002.5~Present |
32 | GongShin Co. | 2002.7~2003.11 |
31 | SamKwang Aquaclear INC. | 2002.4~2002.8 |
30 | N-LNG PHASE3GAS SUPPLY PJ | 2002.4~Present |
29 | CCAGGP | 2002.1~Present |
28 | CCAGGP PJ | 2001.8~Present |
27 | KFCC PJ | 2001.4~2002.1 |
26 | Hpcem PJ | 2001.8~2002.10 |
25 | Polyol Ⅱ PJ | 2001.4~2001.9 |
24 | Uljeongbu MSW PJ | 2001.3~2001.11 |
23 | MADERO PJ | 2001.1~2001.8 |
22 | CCAGGP PJ | 2001.2~2003.3 |
21 | CCAGGP PJ | 2000.10~2002.4 |
20 | CCAGGP PJ | 2000.8~2002.2 |
19 | KWALE GAS INJECTION UPGRADING | 2002.12~Present |
18 | CCAGG PJ | 2003.6~Present |
17 | Libya WAFA Gas Plant | 2002.8~Present |
16 | N-LNG PHASE 3 GAS SUPPLY PJ | 2002.2~Present |
15 | N-LNG PHASE 3 GAS SUPPLY PJ | 2002.05. ~ 2002.09. |
14 | Incheon Slulce GateRepair PJ | 2003.3~2003.10 |
13 | LP Shang Hai PJ | 2003.1~2003.10 |
12 | KUNHO BPA(Ⅱ) PJ(Oil Refinery Plant) | 2001.7~2002.6 |
11 | Traverding Reducer PJ | 2002.12~2003.5 |
10 | H2S Plant | 2001.10~2001.12 |
9 | BTX REVAMP PJ(Petrochemical Plant) | 2001.10~2001.12 |
8 | KUNHO BPA(Ⅱ) PJ(Oil Refinery Plant) | 2001.7~2002.6 |
7 | 540 CO2 RemovalPlant | 2001.6~2002.12 |
6 | HPC 3EG Plant PJ | 2001.6~2002.12 |
5 | City Gas Pipeline | 2001.2~2002.1 |
4 | Power Generation Facility PJ(Power Plant) | 2001.2~2002.1 |
3 | In chon LNG | 2001.11~2003.10 |
2 | Boryung Heating Power Plant#4.5 | 2000.3~2000.5 |
1 | Tong young LNG | 2000.5~2002.10 |